21st Century Green Tech Customized Rapid Assembly 

Steel & Foam Cement Building Kits

 

 

Our factory-manufactured PanLbilt wall and roof panels comprise a patented process that inserts electrical and water pipes inside the steel frame foam cement panels to accelerate on-site assembly.

 

 

Click here to download the Genny Models Technical Information

 

Once the site properly prepared with grading and the setting of the cement pad, assembly begins. Each panel has a male side with hooks and a female side with support holes to enable close coupling with less than 2mm separate between panels. The gaps are then sealed with waterproof putty. The finished panels insure waterproofing and are impervious to mold and mildew. The exterior can be painted with a final coat or exterior siding, stone or brick can be affixed to reflect the aesthetics of the neighborhood.

i

Within 30 days of assembly of the Two Story Building Kit, contractors completed electrical and water connections, installed flooring, painted, bathroom and kitchen fixtures, cabinets and all other tasks required to pass inspection & obtain building occupancy.

 

For further technical information, please contact our Marketing Department at allano@PanLbilt.com